Skip to content

04 Planning: Job Plans, PMs, Routes and Safety

MODULE 04

Planning: job plans, PMs, routes and safety

Job plans, preventive maintenance schedules, routes and safety (hazards, precautions, lockout/tagout, permits).

Term Difficulty Status
Job plans
Job Plan Beginner Draft
Job Plan Status Intermediate Draft
Job Plan Revision Intermediate Draft
Nested Job Plan Advanced Draft
Job Plan Materials / Labor / Services / Tools Beginner Draft
Preventive maintenance
Preventive Maintenance (PM) Record Beginner Draft
Time-based Frequency Beginner Draft
Meter-based Frequency Intermediate Draft
Fixed vs Floating Schedule Intermediate Draft
Lead Time (PM) Beginner Draft
Work Order Generation (PM) Intermediate Draft
Job Plan Sequence Advanced Draft
PM Hierarchy Advanced Draft
Master PM Advanced Draft
Seasonal Dates Intermediate Draft
PM Forecast Intermediate Draft
Routes
Route Intermediate Draft
Route Stop Intermediate Draft
Safety
Safety Plan Intermediate Draft
Hazard Beginner Draft
Precaution Beginner Draft
Lockout/Tagout (LOTO) Beginner Draft
Permit to Work Intermediate Draft