Skip to content

Meter-based Frequency

Intermediate Draft M04-008

A PM schedule driven by usage measured on a continuous meter, such as every 2,000 run hours or 10,000 km.

Where in Maximo

Preventive Maintenance app, Frequency tab, Meter-based

At Riverbend PM-P101-LUBE triggers every 500 run hours on the RUNHOURS meter.

Related Terms