Skip to content

Job Plan Sequence

Advanced Draft M04-012

A PM setting that uses different job plans at different intervals, such as a basic check monthly and a full overhaul every twelfth time.

Where in Maximo

Preventive Maintenance app, Job Plan Sequence tab

At Riverbend PM-P101-QTR uses JP-INSP-PUMP normally, and JP-OVERHAUL-PUMP every 4th time (once a year).

Related Terms