Lockout/Tagout (LOTO)

Beginner Draft M04-022

The steps used to isolate energy sources and tag them so equipment cannot be started while someone is working on it.

Where in Maximo

Lock Out / Tag Out app; Safety Plans

At Riverbend Before seal work on P-101, breaker MCC-3-07 is locked out and tagged with Dev's tag.