Fixed vs Floating Schedule

Intermediate Draft M04-009

A fixed schedule keeps the next due date anchored to the original plan no matter when the last job was done. A floating schedule resets from when the last work order was actually completed or started.

Where in Maximo

Preventive Maintenance app (Use Last Work Order's Start Date to Calculate Next Due Date option)

At Riverbend If quarterly PM work is done two weeks late, a fixed schedule keeps the same next date, while a floating schedule pushes the next one two weeks out.

Related Terms

Common Misconception

Teams often switch to floating without realizing it can quietly reduce how often critical PMs happen.