14 Maintenance and Reliability Concepts
MODULE 14
Maintenance and reliability concepts
The maintenance and reliability ideas behind Maximo: strategies, RCM, FMEA, P-F curve, MTBF, MTTR and other metrics.
| Term | Difficulty | Status |
|---|---|---|
| Strategy | ||
| EAM vs CMMS | Beginner | Draft |
| Asset Lifecycle | Beginner | Draft |
| Reactive (Run-to-Failure) Maintenance | Beginner | Draft |
| Preventive Maintenance | Beginner | Draft |
| Condition-based Maintenance (CBM) | Intermediate | Draft |
| Predictive Maintenance | Intermediate | Draft |
| Reliability-Centered Maintenance (RCM) | Advanced | Draft |
| FMEA / FMECA | Advanced | Draft |
| Criticality Analysis | Intermediate | Draft |
| P-F Curve | Intermediate | Draft |
| Root Cause Analysis (RCA) | Intermediate | Draft |
| Bad Actor | Beginner | Draft |
| Total Cost of Ownership (TCO) | Intermediate | Draft |
| ISO 55000 | Intermediate | Draft |
| Digital Twin | Intermediate | Draft |
| Metrics | ||
| MTBF (Mean Time Between Failures) | Beginner | Draft |
| MTTR (Mean Time to Repair) | Beginner | Draft |
| Availability | Intermediate | Draft |
| OEE (Overall Equipment Effectiveness) | Intermediate | Draft |
| PM Compliance | Beginner | Draft |
| Planned Maintenance Percentage | Intermediate | Draft |
| Wrench Time | Intermediate | Draft |
| Remaining Useful Life (RUL) | Advanced | Draft |