Wrench Time
The share of a technician's shift spent actually doing hands-on work, as opposed to waiting, traveling or looking for parts.
Where in Maximo
Studies; labor reporting
At Riverbend A study finds RWA techs spend 35 percent of their day on actual work.
Related Terms
Verify in IBM Docs: Industry references (SMRP, ISO 55000) and Maximo Health / Predict docs