Skip to content

Task (Work Order Task)

TASKID Beginner Draft M03-011

A step inside a work order. Tasks can have their own status, labor and materials, and can be linked so one must finish before another starts.

Where in Maximo

Work Order Tracking, Plans tab, Tasks

At Riverbend Task 10: lock out pump. Task 20: drain casing. Task 30: replace seal. Task 40: test and return to service.

Related Terms