Skip to content

Downtime on Work Order

Intermediate Draft M03-021

Reporting an asset down and back up directly from a work order so the outage is tied to the work that caused it.

Where in Maximo

Work Order Tracking, Report Downtime action

At Riverbend P-101 downtime of 6.4 hours is linked to WO 50231.

Related Terms