Downtime on Work Order
Reporting an asset down and back up directly from a work order so the outage is tied to the work that caused it.
Where in Maximo
Work Order Tracking, Report Downtime action
At Riverbend P-101 downtime of 6.4 hours is linked to WO 50231.
Related Terms
Verify in IBM Docs: IBM Docs > Maximo Manage > Work management